Power,done rightthe first time.
Panel upgrades, EV chargers, lighting and the flickering outlet you've been ignoring. Licensed master electricians, permitted work, and a flat price before we touch a wire.
Charge at home by next week
A Level 2 charger adds roughly 20 to 30 miles of range per hour. Most of the price comes down to two things: how far the garage is from your panel, and whether the panel has room.
Estimate for a typical attached garage. Final price is confirmed in writing after a 20-minute site check.
What we wire
Residential only. Every job that needs a permit gets one, and we schedule the city inspection for you.
Panel upgrades
100A to 200A service, Federal Pacific and Zinsco replacements, meter base and grounding.
$2,400EV chargers
Level 2 circuits for any brand, load calculation included, permitted and inspected.
$650Lighting
Recessed cans, under-cabinet LEDs, landscape lighting and fixture swaps.
$189Generators
Standby generator hookups and manual transfer switches for portable units.
$1,100Troubleshooting
Dead outlets, tripping breakers, flickering lights. Diagnosis credited to the repair.
$99Smart home
Smart switches, video doorbells, whole-home surge protection and dedicated circuits.
$149Permitted. Inspected. Signed off.
Plenty of electrical work in North Texas gets done without a permit. That's a problem the day you sell the house or file an insurance claim.
Site check
We look at the panel, the run and the load, then quote a flat price on the spot.
Permit
We pull the permit with your city. You don't fill out a single form.
Wire it
Usually one day. Power is off for as little time as possible, and we tell you when.
Sign-off
We meet the city inspector and send you the approved permit for your records.
Straight answers
Q.01Do I need a panel upgrade for an EV charger?
Not always. Many 200A panels have room for a 40 or 48 amp circuit. Older 100A panels often don't. We run a load calculation on the first visit, so you only upgrade if the numbers say you have to.
Q.02My breaker keeps tripping. Is that dangerous?
The breaker is doing its job, but it's telling you something. Too much on one circuit, a short or a failing breaker are the usual causes. If it trips again right after you reset it, leave it off and call us.
Q.03What about a warm outlet or burning smell?
Treat it as urgent. Shut off that circuit at the panel, don't plug anything back in, and call. If you see smoke or flame, get out and call 911 first.
Q.04Do you pull permits?
Yes, for every job that requires one. The permit fee is listed separately on your quote, so you see exactly what the city charges.
Q.05How soon can you come out?
Troubleshooting calls are usually same day or next day. Panel upgrades and EV chargers are typically installed within a week of your site check, depending on permit turnaround.
Flip the switch.
Licensed electricians for Irving, Las Colinas, Coppell, Grapevine, Euless and Farmers Branch. Call or text, and a person picks up.
(469) 555-0118